June 2022 – Balcony Construction

Please click on the first image to view as a slide show.

Existing decayed cantilevered subfloor joists and deteriorated waterproofed flooring
Decayed joists prior to removal
New balcony to be supported at outboard with concrete footings.  Excavation for footings being done
On site rebar fabrication for new concrete footings
Fabricated rebar placed in excavated footings
Post / beam base bracket connected to footing reinforcement and ready for concrete pour
Concrete poured with sono tube providing above grade forming
Decayed joists cut back to accommodate new footings.  Lower section of siding being removed.
Decayed subfloor framing exposed after waterproofing and floor sheathing removed
Good example of decay at location where original design and lack of flashing details caused trapped moisture and decay
Subfloor framing corrections completed
New siding installed below subfloor with building paper and Z bar flashing to house new ledger. Hold down straps for railing post at subfloor installed
New T & G subfloor sheathing attached to repaired subfloor with glue and screws
Additional moiststop waterproofing added to ledger pocket
New ledger fasteners being installed efficiently with pneumatic equipment
New pressure treated ledger and support beams installed
New pressure treated joists being installed
New joists, joist hangers connecting joists to ledger and rim joists installed
Metal post straps attaching railing posts to subfloor, subfloor fascia and metal floor edge flashing being installed
Metal straps indicate railing post locations
Subfloor fascia notched at post straps prior to install
Balcony outboard subfloor corner prior to edge metal flashing install
Metal flashing fabricated on site by ASC crew, providing high end finish and lasting water protection to new balcony
Metal flashing corner fabricated and ready for install
Beautiful metal flashing install at balcony corner
Edge metal flashing installed and primed / painted
Bonderized floor to wall flashing and floor surface transition flashing installed at perimeter of waterproofed section of flooring
Custom flashing fabricated on site to protect vulnerable location which has historically trapped moisture and decayed framing in Newport Crest. Transition floor flashing, siding to trex flashing and waterproof to siding flashing all merging here beautifully.
Subfloor railing post nailed to attachment straps and site fabricated flashing protecting post base and tying into adjacent flashing components
Site fabricated metal flashing protecting trex / waterproofing transition location which has historically been a water intrusion sweet spot causing much framing decay and repair cost for the HOA.
Metal counter flashing incorporated into door threshold detail
Rubberized membrane installed at plywood joints to absorb and mitigate subfloor movement  which could potentially crack waterproofing system.
First stage of ‘Westcoat ALX reinforced metal lath waterproofing system ‘This is a high-end proven system appropriate for wood subfloors with unmatched strength and durability.  Metal lath being laid on subfloor
Metal lath being fastened with pneumatic stapler
Lath installed
First coat of waterproof acrylic cement being applied and blending into reinforced, galvanized metal lath
First coat applied
Balcony perimeter siding and discolored insulation removed
New insulation installed as needed
Moistop flashing applied at window perimeter and secondary drainage plain building paper being installed
New decay resistant composite panel siding being installed
Siding and trim installation completed
New perimeter trex decking boards being installed and notched at corner to accommodate post straps
Full length trex boards being installed
Trex transcends / Island Mist color – beautiful composite, decay resistant product
Trex decking installed
Post base bracket sandwiched between post hold down brackets – ready for post installation
Decay resistant con heart redwood railing posts.
Railing posts being cut to correct height
Rail framing components being installed with metal brackets required at almost every joint – California Construction !!!
Rail framing completed and building paper being installed
Building paper installed at railing and reinforced moistop flashing installed in addition at top of framing
Siding installation at railing completed
Beautiful composite / decay resistant material for (3) rail caps and trim to complete balcony railing
Second coat of acrylic cement at waterproofed floor being applied
Second coat application completed
Masking installed and floor ready for texture application
Orange peel texture being applied
Texture application completed
Acrylic top coat with color applied to waterproofing system
Exterior painting completed and job done – Beautiful !!!
Beautiful material and color contrasts
Smart panel siding beveled at bottom to sit perfectly on the floor to wall metal deck flashing – meticulous attention to detail.
Beautiful angles, details and transitions resulting from conscientious, quality workers with a commitment to excellence at every phase of every project.
Nice!!!
Beautiful finished corner details at outboard edge of balcony
Exterior completed.  In Summary  Experience has taught me that the correct design /details, correct materials, quality tradesmen will result in a balcony providing 40 plus years durability.  Balconies without these criteria may be looking at 12 years minus durability.  A big thank you and well done to ASC staff – Vicente, Fernando, Valentin and David!
 

 

← Columbia 300 - Basic Image Browser Test Newport Crest - Balcony and Patio Doors →
View all Projects
Contact Us

General Contractor serving Southern California since 1992 providing reconstruction, remodel and repair for Homeowners Associations (HOAs), Residential and Commercial projects.

© 2025 Angus Smith Construction

Contractors License #637440