ASC Logo
  • Home
  • Projects
  • Industry Articles
  • Services
  • About
  • Contact
714-538-1191

Project Gallery

September 2009 – Sliding Replacement

Please click on the first image to view as a slide show.

Old wood siding, decayed and showing its age prior to replacement
Start of replacement process - nail removal and scaffold assembly
Lower levels of existing siding removed

Building paper for secondary drainage plain, new siding and z bar flashing installed at lower level
Building paper for secondary drainage plain, new siding and z bar flashing installed at lower level
Window perimeter flashing being installed prior to siding install

New decay resistant, composite window which matches siding installed
Additional levels / coarses of siding being installed
Secondary drainage plain building paper being installed at higher level

Full complement of scaffolding in use to accommodate upper levels of siding installation
Gable end siding install prior to painting
Gable end siding install with horizontal composite trim at siding butt joints.

Gable end painted / completed
Gable end painted / completed with no horizontal trim.
Another gable end completed with horizontal trim - the trim is more likely to trap moisture which isn't good

Another gable end completed with Smart Panel Siding.

← Aug 2009 - Masonry Jan 2011 - Masonry Steps →
View all Projects
Contact Us

General Contractor serving Southern California since 1992 providing reconstruction, remodel and repair for Homeowners Associations (HOAs), Residential and Commercial projects.

© 2023 Angus Smith Construction

Contractors License #637440